Jinan Metro
Line 1 train at Gongyanyuan station
Line 1 train at Gongyanyuan station
Overview
LocaleJinan, Shandong
Transit typeRapid transit
Number of lines3 operating
2 under construction
3 planned
Number of stations40
Operation
Began operation1 April 2019; 5 years ago (2019-04-01)[1]
Technical
System length84.25 km (52.35 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Jinan Metro (Chinese: 济南地铁; pinyin: Jǐnán Dìtiě), also known as Jinan Rail Transit (Chinese: 济南轨道交通; pinyin: Jǐnán Guǐdào Jiāotōng) is a rapid transit system serving Jinan, the capital of Shandong province, China.

Lines[edit]

Line Terminals
(District)
Opened Length
in km
Stations
 1  Fangte
(Huaiyin)
Gongyanyuan
(Changqing)
1 April 2019 26.27 11
 2  Wangfuzhuang
(Huaiyin)
Pengjiazhuang
(Licheng)
26 March 2021 36.39[2] 19[2]
 3  Longdong
(Lixia)
Tantou
(Licheng)
28 Dec 2019 21.592 12[a]
Total 84.25 42
  1. ^ Peijiaying station is not open.

Line 1[edit]

Line 1 runs north–south in the western part of the city. The line began operating on 1 April 2019, and cost CN¥12 billion to build.[3][1]

Line 2[edit]

Line 2 is 36.39 kilometres (22.61 mi) in length, including a 34.8-kilometre (21.6-mile)-long underground section.[4] The line began operating on 26 March 2021.

Line 3[edit]

Line 3 (Phase 1) is 21.592 kilometres (13.417 miles) long. It is completely underground. The line began operating on 28 December 2019.[5]

Rolling stock[edit]

Lines 1, 2, and 3 use Type B rolling stock. Lines 2 and 3 have six-car trains, whereas Line 1 has four-car trains with provision for an increase to six-car trains in the future.

Lines 4, 6, 7, 8 and 9 will use high capacity Type A rolling stock.[6]

History[edit]

Planning of the system began in the early 2000s but was delayed due to 2008 world economic crisis. After years of preparation, construction started at an official ceremony on 29 December 2013. Line 1 was opened on 1 April 2019.[1]

The first phase of construction was adopted by National Development and Reform Commission and included three lines (1, 2, and 3) with 47 stations. The first phase has a total length of 96.5 kilometres (60.0 mi): 72.2 kilometres (44.9 mi) underground, 23.8 kilometres (14.8 mi) elevated, and one-half kilometre (0.3 miles) transitional. It is expected to cost up to ¥48.9 bn.

The fare system is based on existing smart card technology.[7]

Future[edit]

Network planning map
Phase 2 Construction Plan (2020–2025)[6]

Phase 2 was approved by the National Development and Reform Commission on 30 October 2020. Phase 2 consists of 159.6 km of new subway and is proposed to start construction in 2020.[8]

Line Terminals
(District)
Opening
Date
Length
in km
Stations Status
 3 
Phase 2
Tantou Yaoqiang Airport 2024 12.9 5 Under Construction
 4  Xiaogaozhuang Pengjiazhuang 2026[9] 40.2 32 Under Construction[9]
 6  Weilizhuang Liangwangdong 2027 40.1[10] 33 Under Construction[10]
 7  Jinan North Railway Station Fenghuang Nanlu 2026 30.0 22 Under Construction[11]
 8  Xingcun Shandong University 2026 22.6 10 Under Construction
 9  Huanghenan'an Maozhuang 2026 14.8 11 Under Construction