Cannabis Ruderalis

Content deleted Content added
33ryantan (talk | contribs)
An admin please ban this user please.
219.92.108.229 (talk)
No edit summary
Tags: Mobile edit Mobile app edit
Line 82: Line 82:
|{{SMRT code|DT|3}}||[[Hillview MRT Station|Hillview]]||
|{{SMRT code|DT|3}}||[[Hillview MRT Station|Hillview]]||
|-
|-
|{{SMRT code|DT|4}}||Future Station||<small>''Located at Hume Avenue/Shell station''</small>
|{{SMRT code|DT|4}}||Future Station||<small>''Located at Hume Avenue; IT'S NOT SHELL STATION!!! DON'T BE STUPID!!!
|-
|-
|{{SMRT code|DT|5}}||[[Beauty World MRT Station|Beauty World]]||
|{{SMRT code|DT|5}}||[[Beauty World MRT Station|Beauty World]]||
Line 108: Line 108:
|{{SMRT code 2I/C|DT|15|CC|4}}||[[Promenade MRT Station|Promenade]]||Change to [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']]
|{{SMRT code 2I/C|DT|15|CC|4}}||[[Promenade MRT Station|Promenade]]||Change to [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']]
|-
|-
|{{SMRT code 2I/C|DT|16|CE|1}}||[[Bayfront MRT Station|Bayfront]]||Change to [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']]
|{{SMRT code 2I/C|DT|16|CE|1}}||[[Bayfront MRT Station|Bayfront]]||Crossover to opposite platform for [[Circle MRT Line|'''{{fontcolor|#ff9a00|Circle Line}}''']] services
|-
|-
|{{SMRT code|DT|17}}||[[Downtown MRT Station|Downtown]]||
|{{SMRT code|DT|17}}||[[Downtown MRT Station|Downtown]]||

Revision as of 14:48, 21 December 2015

 DTL 
Downtown MRT Line
Laluan MRT Pusat Bandar
滨海市区地铁线
டவுன்டவுன் எம்ஆர்டி வழி
The Downtown Line is coloured blue on system maps.
Overview
StatusOperational (Stage 1)
Under testing (Stage 2)
Under construction (Stage 3)
Under planning (DTL3e)
OwnerLand Transport Authority
Termini
Stations6 (Operational)[1]
16 (U/C)
12 (Under Testing)
2 (Under Planning)
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services1
Operator(s)SBS Transit DTL[2]
(ComfortDelGro Corporation)
Depot(s)Gali Batu
Kim Chuan
Changi (Future)
Rolling stockC951
History
Opened22 December 2013 (Stage 1)
27 December 2015 (Stage 2)
2017 (Stage 3)
2024 (DTL3e)
Technical
Line length4.3 km (2.7 mi) (operational)[1]
16.6 km (10.3 mi) (Under Testing)
21 km (13 mi) (U/C)
2.2 km (1.4 mi) (Under Planning)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speedlimit of 80 km/h
SignallingSiemens Trainguard SIRIUS CBTC
Route map
Template:Infobox RDT

The Downtown Line (DTL) is the fifth Mass Rapid Transit line in Singapore. The 4.3-kilometre (2.7 mi), 6 station Stage 1 of the line opened on 22 December 2013,[3] with Stage 2 on 27 December 2015[4][5] and Stage 3 due to open in 2017. The line will connect the North-Western and Central-Eastern regions to the new downtown of Singapore.

The Downtown Line interchanges with the North East Line at Chinatown, with the East West Line at Bugis, and with the Circle Line at Bayfront and Promenade. Future extensions of the Downtown Line will interchange with the North East Line at Little India, with the North South Line at Newton, with the East West Line at Tampines and Expo, with the Circle Line at MacPherson and Botanic Gardens, with the Thomson-East Coast Line at Stevens and Sungei Bedok and with the Bukit Panjang LRT at Bukit Panjang.

This line is the third in Singapore to be entirely underground (apart from the Gali Batu Depot). When fully completed, the line will be about 44 km (27 mi) long with 37 stations and will serve more than half a million commuters daily.[6] It will also be the longest driverless rapid transit line in Singapore,[1] surpassing the record set by the Circle Line. Travelling from one end to the other will take around 70 minutes. The line is coloured blue in the rail map.[2]

History

LTA's Downtown Line (Stage 1) project office next to Bugis MRT station.

On 14 June 2005, the Land Transport Authority announced the Downtown Extension of the Circle Line to serve the Downtown at Marina Bay area, where an integrated resort (Marina Bay Sands) and Singapore's second botanical garden (Gardens by the Bay) was to be located. The 3.4-kilometre fully underground line was estimated to cost S$1.4 billion. Construction of the extension began in January 2008. During the construction of the North East Line at Chinatown station, platform provisions were built to facilitate an interchange station.

Stage 2 of the Downtown Line was first conceptualized and announced as the Bukit Timah Line. It was supposedly a 20-kilometre line that would connect the new downtown with the Bukit Panjang, Upper Bukit Timah and Bukit Timah corridor, alleviating the heavy traffic travelling along the sector, but a full route was released. Provisions were provided at Nicoll Highway station which would have seen the line terminating there and interchanging with the Circle Line.[7] However, the Nicoll Highway collapse and subsequent feasibility works deemed the old station unusable.[8] The former Downtown Extension of the Circle Line was subsequently amalgamated into the Downtown Line and was revamped as part of Stage 1, a 4.3-kilometre (2.7 mi), 6 station segment connecting Chinatown to Bugis stations.[1] Stage 2 is now 16.6-kilometre (10.3 mi) long and consists of twelve stations,[1] including three interchange stations.

Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at Beauty World Station and was scheduled to be completed and opened in end-2015.[9][10][11]

Stage 3 of the Downtown Line consists of the original Eastern Region Line that was announced in 2001. The route goes from Chinatown to Expo. The station locations and finalized route were unveiled on 20 August 2010.[12] Stage 3 of the Downtown line will be 21-kilometre (13 mi) long and serve 16 stations.[1] The completion is set for the first half of 2017.[13]

A new depot, the Gali Batu Depot, is under construction at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road to serve the line.[14]

In August 2011, SBS Transit won the bid and was appointed to be the operator of the Downtown Line, under a new framework which would see the authority remaining the owner of the line.[15] Final costs of building the line may reach an estimated S$20.7 billion, up more than 70% from an initial estimation of S$12 billion.[16] In January 2013, plans for a southern extension which will run from Expo through the East Coast area, interchanging with the Eastern Region Line were announced for completion by 2025.[17]

On June 2013, the insolvency of Alpine Bau, the contractor for the King Albert Park, Sixth Avenue and Tan Kah Kee stations resulted in Stage 2's opening to be delayed to mid-2016.[18]

Stage 1 of the Downtown Line began service on 22 December 2013,[19] with its official inauguration made on the day before by Prime Minister Lee Hsien Loong.[20]

DTL3e was announced on 15 August 2014, in conjunction with the announcement of the Thomson-East Coast MRT Line.[21] Two stations, Xilin MRT Station and Sungei Bedok MRT Station will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson-East Coast Line. It will add an additional 2.2 km to the line with the extension.[21] Due in 2024, Stage 3e will join the current East West and future Thomson-East Coast lines that runs through Marine Parade.[22]

In October 2014, it was announced that the Stage 2's opening delayed to the first quarter of 2016.[23] On 28 June 2015, Transport Minister Lui Tuck Yew announced that the delay caused by Alpine Bau's insolvency in mid-2013 was "completely resolved" by the authorities and Stage 2 opening date goes back to December 2015.[5]

Stations

Here are the following station locations for all three stages of the Downtown Line.

Station Number Station Name Interchange/Notes
Stage 2 (Under testing)/Opening on Sunday December 27th 2015
 DT1  BP6  Bukit Panjang Change to Template:SLRT lines
 DT2  Cashew
 DT3  Hillview
 DT4  Future Station Located at Hume Avenue; IT'S NOT SHELL STATION!!! DON'T BE STUPID!!!
 DT5  Beauty World
 DT6  King Albert Park
 DT7  Sixth Avenue
 DT8  Tan Kah Kee
 DT9  CC19  Botanic Gardens Change to Circle Line
 DT10  TE11  Stevens Change to Thomson-East Coast Line (2021)
 DT11  NS21  Newton Change to North South Line
 DT12  NE7  Little India Change to North East Line
 DT13  Rochor
Stage 1 (Operational)
 DT14  EW12  Bugis Change to East West Line
 DT15  CC4  Promenade Change to Circle Line
 DT16  CE1  Bayfront Crossover to opposite platform for Circle Line services
 DT17  Downtown
 DT18  Telok Ayer
 DT19  NE4  Chinatown Change to North East Line
Stage 3 (Under construction)
 DT20  Fort Canning
 DT21  Bencoolen
 DT22  Jalan Besar
 DT23  Bendemeer
 DT24  Geylang Bahru
 DT25  Mattar
 DT26  CC10  MacPherson Change to Circle Line
 DT27  Ubi
 DT28  Kaki Bukit
 DT29  Bedok North
 DT30  Bedok Reservoir
 DT31  Tampines West
 DT32  EW2  Tampines Change to East West Line
 DT33  Tampines East
 DT34  Upper Changi
 DT35  CG1  Expo Change to East West Line (Changi Airport Branch)
DTL3e (Under planning)
 DT36  Xilin
 DT37  TE31  Sungei Bedok Change to Thomson-East Coast Line (2024)

Rolling stock

A view of the Chinatown station on the Downtown Line platform.

The rolling stock consists of Bombardier MOVIA C951 cars,[24] running in three-car formation. They will be stabled at Gali Batu Depot when it opens with Stage 2 of Downtown Line by December 2015. For the period between the operation of Downtown Line Stage 1 and Downtown Line Stage 2, trains will be stabled at a maintenance facility that was built at Marina Bay as part of the Circle Line project. Kim Chuan Depot will house the Operations Control Centre for the Downtown Line until Gali Batu Depot and Changi Depot is ready to be used.[25]

On 12 October 2012, the first of 11 trains for the Downtown Line Stage 1 arrived at Jurong Port. It was transported to Kim Chuan Depot to undergo testing by LTA before it was handed over to SBS Transit.[26] As of 28 February 2013, Bombardier had delivered five of the 11 trains for Downtown Line Stage 1.[27] LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.[3]

Testing on the Downtown Line Stage 2 has begun during operational hours since 25 October 2015 and rolling stock that was delivered to Gali Batu Depot have commenced service on Stage 1 starting on 21 October 2015, possibly indicating operations to transfer from Kim Chuan Depot to Gali Batu Depot are nearly complete.

Train control

The Downtown Line is equipped with Siemens (previously Invensys before Siemens acquisition) Trainguard SiriusCommunications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[28][29] The subsystems consist of Automatic train protection (ATP) to govern train speed, Controlguide Rail 9000 Automatic Train Supervision (ATS) to track and schedule trains and Trackquard Westrace MK2 Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.

A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system.

Automatic platform screen doors by Westinghouse provide safety for passengers, offering protection from arriving and departing trains.

External links

References

  1. ^ a b c d e f "Projects - Downtown Line - Stages". Land Transport Authority of Singapore. 17 December 2013. Retrieved 23 June 2014.
  2. ^ a b "Company Announcement – Incorporation of a Wholly-Owned Subsidiary" (PDF).
  3. ^ a b "Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22". The Straits Times. Retrieved 16 November 2013.
  4. ^ "The Rail Report: 12 Stations of Downtown Line 2 to Open on 27 December". Land Transport Authority. 6 August 2015.
  5. ^ a b "Downtown Line 2 to open ahead of schedule in December: Transport Minister Lui". Channel NewsAsia. 28 June 2015.
  6. ^ "MORE TRAINS, MORE CAPACITY, MORE OFTEN", Land Transport Authority
  7. ^ Land Transport Authority (24 January 2014). "Circle Line Linking All Lines". The Straits Times. p. 50.
  8. ^ "Govt approves S$12b MRT Downtown Line to be built by 2018".
  9. ^ "Groundwork begins for new MRT lines", Christopher Tan, The Straits Times, 13 March 2006
  10. ^ "LTA unveils locations of DTL stage 2 stations", Christopher Tan, The Straits Times, 15 July 2008
  11. ^ "Work on MRT Downtown Line Phase 2 Starts", Tyler Thia, Channel NewsAsia, 3 July 2009
  12. ^ Downtown Line 3 Station Locations Unveiled. Land Transport Authority, 20 August 2010
  13. ^ Downtown Line 3 Station Names Announced
  14. ^ "Downtown Line depot to be located off Woodlands Road", Margaret Perry, Channel NewsAsia, 26 February 2008
  15. ^ LTA Appoints SBS Transit Limited to Operate Downtown Line under New Rail Financing Framework Land Transport Authority – 29 August 2011
  16. ^ "Downtown Line costs soar by more than 70%", Christopher Tan, The Straits Times, 30 October 2012
  17. ^ "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. January 17, 2013.
  18. ^ "Downtown Line Stage 2 project schedule to be delayed". Today Online.
  19. ^ "Downtown Line". Land Transport Authority. Retrieved 22 December 2013.
  20. ^ "Downtown Line Stage 1 officially opened by PM Lee". The Straits Times. 21 December 2013. Retrieved 22 December 2013.
  21. ^ a b "Thomson-East Coast Line, connecting North and East, ready by 2024", Saifulbahri Ismail, Channel NewsAsia, 15 August 2014
  22. ^ "Downtown Line 3 Extension". Land Transport Authority. 15 August 2014.
  23. ^ "Thumbs Up For Downtown Line's Earlier Opening". The Straits Times.
  24. ^ LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion
  25. ^ Contract 901QP: Terms of Reference, Land Transport Authority, 9 November 2007 (tender document from www.gebiz.gov.sg)
  26. ^ "First Downtown Line train lands in Singapore". Land Transport Authority. Retrieved November 16, 2013.
  27. ^ "Shorter Waiting Time With 15 More Trains For Downtown Line". Land Transport Authority. March 28, 2013. Retrieved March 28, 2013.
  28. ^ Invensys Rail secures signalling contract for Singapore’s new Downtown Line
  29. ^ [1]

Leave a Reply