In telecommunication, electronics and the electrical power industry, the term demand factor is used to refer to the fractional amount of some quantity being used relative to the maximum amount that could be used by the same system. The demand factor is always less than or equal to one. As the amount of demand is a time dependent quantity so is the demand factor.

The demand factor is often implicitly averaged over time when the time period of demand is understood by the context.

Electrical engineering[edit]

In electrical engineering the demand factor is taken as a time independent quantity where the numerator is taken as the maximum demand in the specified time period instead of the averaged or instantaneous demand.

This is the peak in the load profile divided by the full load of the device.

Example: If a residence has equipment which could draw 6,000 W when all equipment was drawing a full load, drew a maximum of 3,000 W in a specified time, then the demand factor = 3,000 W / 6,000 W = 0.5

This quantity is relevant when trying to establish the amount of load for which a system should be rated. In the above example, it would be unlikely that the system would be rated to 6,000 W, even though there may be a slight possibility that this amount of power can be drawn. This is closely related to the load factor which is the average load divided by the peak load in a specified time period.

See also[edit]

References[edit]

One thought on “Cannabaceae

  1. Well, that’s interesting to know that Psilotum nudum are known as whisk ferns. Psilotum nudum is the commoner species of the two. While the P. flaccidum is a rare species and is found in the tropical islands. Both the species are usually epiphytic in habit and grow upon tree ferns. These species may also be terrestrial and grow in humus or in the crevices of the rocks.
    View the detailed Guide of Psilotum nudum: Detailed Study Of Psilotum Nudum (Whisk Fern), Classification, Anatomy, Reproduction

Leave a Reply