401-DVP_interchange.png (369 × 369 pixels, file size: 400 KB, MIME type: image/png)
Description |
An image of the construction of the DVP from York Mills to Sheppard in 1965. In the centre, the current interchange between the DVP, 404 and 401 is being constructed. Highway 401, then only four lanes, is detoured around the interchange and between partially constructed bridges - All four lanes remained open throughout the conversion from 4 to 12 lanes. |
---|---|
Source |
http://www.gettorontomoving.ca/Don_Valley_Parkway.html (originally from Toronto Archives) |
Date |
1965 |
Author |
Ontario Department of Highways (Ministry of Transportation of Ontario) |
Permission (Reusing this file) |
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 12:26, 11 May 2010 | 369 × 369 (400 KB) | Floydian (talk | contribs) | smaller piece of the picture for 401 article |
You cannot overwrite this file.
File usage
The following file is a duplicate of this file (more details):
- File:401-DVP interchange.png from Commons