Cannabis

Transjakarta Corridor 8
Lebak Bulus – Pasar Baru
Kebon Jeruk BRT station is one of the stations that serves Corridor 8
Overview
SystemTransjakarta
Operator
  • PT. Transportasi Jakarta (infrastructures and staffs)
  • Bianglala Metropolitan (fleets and drivers)
Began service21 February 2009 (2009-02-21)
Route
Route typeStreet-level Bus Rapid Transit
LocaleWest Jakarta
Central Jakarta
South Jakarta
Length25.33 km
Stations20 (original)
26 (current temporary adjustment, via Tomang)
24 (current temporary adjustment, via Cideng)
←   Transjakarta corridors   →

Transjakarta Corridor 8 is a bus rapid transit corridor in Jakarta, Indonesia, operated by Transjakarta. It serves the route from Lebak Bulus, South Jakarta to the Pasar Baru BRT station in Central Jakarta. The corridor traverses along Pasar Jumat, Ciputat Raya, TB Simatupang, Metro Pondok Indah, Arteri Pondok Indah (Sultan Iskandar Muda), Teuku Nyak Arif, Letjen Supeno, Panjang, Daan Mogot, Letjen S. Parman, Tomang Raya, Balikpapan, Suryopranoto, Ir. Hj. Djuanda, and Pos streets, and terminates at Pasar Baru. Then continues via Gedung Kesenian, Lapangan Banteng Utama, and Katedral streets towards Lebak Bulus. This corridor is integrated with KRL Commuterline at Kebayoran railway station which serves the Rangkasbitung Line via Kebayoran BRT station, Tangerang Line at Pesing railway station via Damai BRT station, and Bogor Line at Juanda railway station via Juanda BRT station. This corridor is also integrated with the Jakarta MRT at Lebak Bulus Grab station via Lebak Bulus BRT station.

Corridor 8 have a length of 25.33 kilometres (15.74 mi), making it the second longest Transjakarta corridor after Corridor 9 with 28.8 kilometres (17.9 mi) length (until 3 March 2023, from Lebak Bulus to Harmoni. Prior to temporary extension to Pasar Baru).

This corridor originally terminates at Harmoni BRT station, one of the main interchange stations on the Transjakarta BRT system. Due to the construction of the Jakarta MRT phase 2A, Corridor 8 temporarily terminates at Pasar Baru as of 3 March 2023.[1] There are two distinct versions of this corridor: the main route, "Lebak Bulus–Pasar Baru via Tomang" which goes through Tarakan, Tomang Raya, Tanjung Duren, and Grogol Reformasi stations and runs at a headway of 5-10 minutes, and the alternative "Lebak Bulus–Pasar Baru via Cideng" which interlines with Corridor 3 from Petojo to Damai stations (stopping at Grogol and Roxy stations) and runs at a headway of up to 50 minutes off-peak or 5-10 minutes at peak.

History[edit]

Inauguration[edit]

Corridor 8 was inaugurated on 21 February 2009, by the Governor of Jakarta at the time, Fauzi Bowo.[2][3][4] It originally serves the route from Lebak Bulus to Harmoni until it was temporarily readjusted in 2023.

Intermodal integration[edit]

In March 2022, the construction of a pedestrian skywalk in Kebayoran Lama, South Jakarta was started in order to create a transit point that connects Corridor 8 at the Kebayoran BRT station with Corridor 13 at Velbak BRT station and the Kebayoran railway station which serves the Rangkasbitung Line of the KRL Commuterline.[5][6][7] To support the skywalk construction, Kebayoran BRT station was closed on 5 September 2022 for revitalization and Transjakarta users were diverted to use Bungur and Simprug stations during the closure.[8] The Kebayoran Lama skywalk underwent a public trial on 21–24 January 2023,[9] and inaugurated by the Acting Governor of Jakarta, Heru Budi Hartono on 27 January 2023,[10][11] even though the revitalization of Kebayoran BRT station was not finished yet.[12] Kebayoran station was reopened on 6 February 2023.[13]

Temporary readjusment[edit]

Starting on 4 March 2023, as the impact of the construction of Jakarta MRT North–South Line extension to Kota Tua Jakarta, Transjakarta temporarily extends Corridor 8 to the Pasar Baru BRT station, due to its terminus, Harmoni being moved to a temporary building that can only serves Corridor 1 passengers and Corridor 3 terminating at Monumen Nasional, ceasing service of Pecenongan–Pasar Baru segment that the Corridor 8 took over through extension to Pasar Baru station. At the same time, Route 8A (Grogol Reformasi–Juanda via Tomang) merged with the main corridor, so the bus of the main corridor do not stop at the Grogol and Roxy BRT stations.[1][14][15] This main route of Corridor 8 is officially listed as "Lebak Bulus–Pasar Baru via Tomang" and operates all day at a headway of 5-10 minutes. To respond to passenger complaints in regards to traffic jam in Tomang during rush hour, Transjakarta also operates an alternative "Lebak Bulus–Pasar Baru via Cideng" route which mimics the original Corridor 8 by interlining with Corridor 3 from Petojo to Damai instead of going through Tomang, thus stopping at Grogol and Roxy, and runs at a headway of up to 50 minutes off-peak or 5-10 minutes at peak. Route 8A still currently runs as a shortened main Corridor 8 (via Tomang) during Car Free Day (CFD) in Petojo area on Sunday mornings.

List of BRT stations[edit]

  • As the impact of the Jakarta MRT construction, Transjakarta temporarily extends the main Corridor 8 to the Pasar Baru BRT station, taking over Pecenongan, Juanda, and Pasar Baru stations from Corridor 3 that currently terminates at Monumen Nasional, by merging the previously all-day-available Route (previously Grogol Reformasi–Juanda via Tomang) with the main corridor, starting from 4 March 2023, until the MRT construction completed in 2027 or 2029.[1][14][15] As the result, Petojo, Tarakan, and Tomang stations which were previously exclusively served by Route without any main corridor service are now served by main Corridor 8. Route is still available as a shortened main corridor during Car Free Day (CFD) in Petojo area on Sunday mornings, but now terminates at Jelambar and Pasar Baru. All routes currently do not stop at Harmoni.
  • Currently, all stations are served by buses 24 hours a day.[16]
  • Station indicated by a → sign has a one way service towards Pasar Baru only.

Main route (via Tomang)[edit]

  • This route runs at a headway of 5-10 minutes all day.
TransJakarta Corridor 8 Corridor 8 (Lebak BulusPasar Baru via Tomang)
Code Station name Transfer/Notes Bus terminal or train station nearby
Stations in order: From top to bottom (downwards) towards Pasar Baru (→); from bottom to top (upwards) towards Lebak Bulus (←)
801 Lebak Bulus Lebak Bulus Grab

Bus Terminal Lebak Bulus Bus Terminal

802 Pondok Pinang →
Towards Lebak Bulus (←) heads straight to Lebak Bulus
803 Underpass Lebak Bulus
804 Pondok Indah
805 Tanah Kusir
806 Bungur
807 Kebayoran Koridor 13 Transjakarta Koridor 13 Transjakarta Koridor 13 Transjakarta Velbak (via skybridge) Kebayoran
808 Simprug
809 Permata Hijau
810 Arteri
811 Pos Pengumben
812 Kelapa Dua Sasak
813 Kebon Jeruk
814 Duri Kepa
815 Kedoya Panjang
816 Kedoya
817

309

Damai Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Damai
818

310

Jelambar Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Jelambar Pesing
819

920

Grogol Reformasi → Koridor 3 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Grogol Reformasi

Koridor 2 Transjakarta Koridor 3 Transjakarta Grogol (via skybridge)

Grogol (Planned)

Bus Terminal Grogol Bus Terminal

Towards Lebak Bulus (←) heads straight to Jelambar
820

919

Tanjung Duren Two separate buildings for opposing directions require exiting paid area to transfer:
  • Eastbound: Towards Pasar Baru (→)
  • Westbound: Towards Lebak Bulus (←)
Taman Anggrek (planned)
Koridor 3 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Tanjung Duren
821 Tomang Raya Koridor 10 Transjakarta Tomang Raya
822 Tarakan Koridor 10 Transjakarta Tarakan Petojo (planned)
823 Petojo Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 10 Transjakarta Petojo
219

314

Pecenongan Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Pecenongan
218

315

Juanda Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Juanda Juanda
316 Pasar Baru Koridor 7 Transjakarta Koridor 10 Transjakarta Pasar Baru

Alternative route (via Cideng)[edit]

  • This route runs at a headway of 5-10 minutes at peak hours and up to 50 minutes off-peak.
TransJakarta Corridor 8 Corridor 8 (Lebak BulusPasar Baru via Cideng)
Code Station name Transfer/Notes Bus terminal or train station nearby
Stations in order: From top to bottom (downwards) towards Pasar Baru (→); from bottom to top (upwards) towards Lebak Bulus (←)
801 Lebak Bulus Lebak Bulus Grab

Bus Terminal Lebak Bulus Bus Terminal

802 Pondok Pinang →
Towards Lebak Bulus (←) heads straight to Lebak Bulus
803 Underpass Lebak Bulus
804 Pondok Indah
805 Tanah Kusir
806 Bungur
807 Kebayoran Koridor 13 Transjakarta Koridor 13 Transjakarta Koridor 13 Transjakarta Velbak (via skybridge) Kebayoran
808 Simprug
809 Permata Hijau
810 Arteri
811 Pos Pengumben
812 Kelapa Dua Sasak
813 Kebon Jeruk
814 Duri Kepa
815 Kedoya Panjang
816 Kedoya
817

309

Damai Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Damai
818

310

Jelambar Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Jelambar Pesing
311 Grogol Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Grogol

Koridor 9 Transjakarta Koridor 9 Transjakarta Grogol Reformasi (via skybridge)

Grogol (Planned)

Bus Terminal Grogol Bus Terminal

312 Roxy Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Roxy
823 Petojo Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 10 Transjakarta Petojo
219

314

Pecenongan Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Pecenongan
218

315

Juanda Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Juanda Juanda
316 Pasar Baru Koridor 7 Transjakarta Koridor 10 Transjakarta Pasar Baru

Special route[edit]

Route 8A (Jelambar – Pasar Baru)[edit]

  • This route is available at certain times and headways during Car Free Day (CFD) in Petojo area, from 06:00 to 10:00 on Sunday mornings, though may run beyond 10:00 at times. During CFD, Corridor 8 is usually shortened to terminate at Tanjung Duren (via Tomang route) or Roxy (via Cideng route).
TransJakarta Corridor 8 Route 8A (Jelambar – Pasar Baru)
Code Station name Transfer/Notes Bus terminal or train station nearby
Stations in order: From top to bottom (downwards) towards Pasar Baru (→); from bottom to top (upwards) towards Jelambar (←)
818

310

Jelambar Koridor 2 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Koridor 3 Transjakarta Jelambar Pesing
819

920

Grogol Reformasi → Koridor 3 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Grogol Reformasi

Koridor 2 Transjakarta Koridor 3 Transjakarta Grogol (via skybridge)

Grogol (Planned)

Bus Terminal Grogol Bus Terminal

Towards Jelambar (←) heads straight to Jelambar
820

919

Tanjung Duren Two separate buildings for opposing directions require exiting paid area to transfer:
  • Eastbound: Towards Pasar Baru (→)
  • Westbound: Towards Jelambar (←)
Taman Anggrek (planned)
Koridor 3 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Tanjung Duren
821 Tomang Raya Koridor 10 Transjakarta Tomang Raya
822 Tarakan Koridor 10 Transjakarta Tarakan Petojo (planned)
219

314

Pecenongan Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Pecenongan
218

315

Juanda Koridor 2 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 10 Transjakarta Juanda Juanda
316 Pasar Baru Koridor 7 Transjakarta Koridor 10 Transjakarta Pasar Baru

Fleets[edit]

  • Mercedes-Benz OH 1626 NG OM906LA A/T, white-dark blue and Jak Lingko card Livery (BMP)
  • Hino RK8 R260, blue (BMP)
  • Hino RK8 R260, blue (BMP, night bus (22:00 - 05:00))

Depot[edit]

  • Bianglala Metropolitan (BMP)
    • Ciputat

See also[edit]

References[edit]

  1. ^ a b c Dewi, Clara Maria Tjandra (3 March 2023). "Halte Harmoni Ditutup, Transjakarta Lakukan Penyesuaian 12 Rute Mulai Besok". Tempo (in Indonesian). Retrieved 5 March 2023.
  2. ^ "Hore, Busway Koridor VIII Diresmikan". detiknews (in Indonesian). Retrieved 19 March 2023.
  3. ^ "Fauzi Bowo Bangga Bisa Resmikan Busway Koridor VIII". detiknews (in Indonesian). 21 February 2009. Retrieved 19 March 2023.
  4. ^ "Foke Resmikan Bus Transjakarta Koridor VIII". KOMPAS.com (in Indonesian). 21 February 2009. Retrieved 6 February 2023.
  5. ^ "Dinas Bina Marga Bangun Dua Skywalk di Kebayoran Lama dan Lebak Bulus". Republika Online (in Indonesian). 20 June 2022. Retrieved 22 June 2023.
  6. ^ Azzahra, Tiara Aliya (3 January 2023). "Skywalk Kebayoran Lama Rampung Dibangun, Kapan Dioperasikan?". detiknews (in Indonesian). Retrieved 27 January 2023.
  7. ^ Skywalk Kebayoran Rampung dan Siap Beroperasi (in Indonesian). Lensa Indonesia - RTV. Retrieved 27 January 2023 – via YouTube.
  8. ^ Huda, Larissa, ed. (1 September 2022). "Halte Transjakarta Manggarai, PGC1, Jembatan Gantung, dan Kebayoran Lama Ditutup Sementara, Simak Alternatifnya". KOMPAS.com (in Indonesian). Retrieved 2 January 2023.
  9. ^ Hikmatiar, Tazkia Royyan (21 January 2023). Pradewo, Bintang (ed.). "Skywalk Kebayoran Lama Mulai Diuji Coba Hari ini, Cek Jadwalnya". JawaPos.com (in Indonesian). Retrieved 27 January 2023.
  10. ^ Tanjung, Sufiani (27 January 2023). "Peresmian Skywalk Terpanjang di Jakarta". CNN Indonesia. Retrieved 28 January 2023 – via YouTube.
  11. ^ @dishubdkijakarta. "Penjabat (Pj) Gubernur DKI Jakarta, Bapak Heru Budi Hartono meresmikan Skywalk Kebayoran di Jakarta Selatan, Jumat (27/01/2023). Pada peresmian itu, turut hadir..." Instagram. Retrieved 27 January 2023.
  12. ^ @pt_transjakarta (27 January 2023). "Sahabat TiJe, mau tahu sudah sampai mana revitalisasi Halte Kebayoran Lama? Sebentar lagi, akan beroperasi loh! #semangaTJakarta #AyoNaikTransjakarta". Instagram. Retrieved 27 January 2023.
  13. ^ @pt_transjakarta (6 February 2023). "Halte Kebayoran lama udah dibuka loh Sahabat TiJe! Ayo coba absen siapa yang udah naik Transjakarta dari halte Kebayoran lama? #AyoNaikTransjakarta". Instagram. Retrieved 6 February 2023.
  14. ^ a b Sari, Brigitta Belia Permata (3 March 2023). "Mulai Besok, Ini Penyesuaian Rute TransJ Imbas Relokasi Halte Harmoni". detiknews (in Indonesian). Retrieved 3 March 2023.
  15. ^ a b @pt_transjakarta (3 March 2023). "Sahabat TiJe, Transjakarta mengucapkan terima kasih atas pengertian para pelanggan akan penyesuaian rute dari konstruksi MRT Jakarta Fase 2A CP 202. Dan mohon maaf atas ketidaknyamanan ini". Instagram. Retrieved 3 March 2023.
  16. ^ Wibawana, Widhia Arum (28 December 2023). "Info Layanan Bus Amari TransJakarta: Daftar Koridor, Rute, Jadwal". detiknews (in Indonesian). Retrieved 1 January 2024.

External links[edit]

Leave a Reply