Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line with 11 stations from Liantang to Xiaomeisha. It opened on 28 October 2020 between Liantang and Yantian Road, with a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.
Phase 2 opened on 27 December 2023, which extended the line from Yantian Road to Xiaomeisha.[3]
Timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Liantang — Yantian Road | 28 October 2020 | 12.367 km (7.68 mi) | 7 | Phase 1 |
Yantian Road — Xiaomeisha | 27 December 2023 | 7.96 km (4.95 mi) | 4 | Phase 2 |
Service routes
[edit]- Liantang — Xiaomeisha (trains continue service on Line 2 after Liantang)
Stations
[edit]Service routes |
Station name | Connections | Nearby bus stops | Distance | Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
^ Trains continue to Chiwan station via Line 2 ^ | ||||||||
● | Liantang | 莲塘 | 2 (through service) | 27 57 113 381 B621 B625 M207 M468 | 0 | 0 | Luohu | |
● | Wutong Mountain South | 梧桐山南 | 27 57 69 85 111 113 308 M103 M133 M191 M199 M205 M207 M364 M437 M468 M520 M555 | 1.46 | 1.46 | |||
● | Shatoujiao | 沙头角 | 68 85 308 B619 M199 M205 M437 M520 | 4.32 | 5.78 | Yantian | ||
● | Haishan | 海山 | 68 85 308 358 308-Fast(358快线)E26 M191 M196 M199 M205 M288 M362 M437 M444 M520 | 1.57 | 7.35 | |||
● | Yantian Port West | 盐田港西 | 68 308 358 308-Fast(358快线)E26 M191 M196 M199 M205 M288 M362 M437 M444 M520 | 1.24 | 8.59 | |||
● | Shenwai Senior Campus | 深外高中 | B925 C4 M348 M444 M465 | 2.68 | 11.27 | |||
● | Yantian Road | 盐田路 | 68 85 358 B676 B925 B927 M205 M205X(M205大站快车)M348 M380 M444 Dameisha-holiday-express-1(大梅沙假日专线1) | 1.41 | 12.68 | |||
● | Hong'anwei | 洪安围 | 1.10 | 13.78 | ||||
● | Yantianxu | 盐田墟 | 1.14 | 14.92 | ||||
● | Dameisha | 大梅沙 | 3.58 | 18.50 | ||||
● | Xiaomeisha | 小梅沙 | 2.14 | 20.64 | ||||
Phase 3
[edit]Phase 3 is under construction. It will extend the line from Xiaomeisha to Xichong and will open in 2025.
Station name | Connections | Location | |
---|---|---|---|
English | Chinese | ||
Xichong | 溪涌 | 32 (through service) | Dapeng New District |
Rolling stock
[edit]Type | Date of manufacture | Series | Sets | Serial number | Assembly | Notes |
---|---|---|---|---|---|---|
Type A | 2019–2020 | Type A stock | 24 | 258–281[801-824] | Tc+Mp+M+M+Mp+Tc | Manufactured by CRRC Zhuzhou Electric Locomotive Works |
Notes
[edit]References
[edit]- ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
- ^ a b "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
- ^ "深圳地铁8号线二期开通日期". citys114. 2023-03-13. Retrieved 2023-04-23.
Well, that’s interesting to know that Psilotum nudum are known as whisk ferns. Psilotum nudum is the commoner species of the two. While the P. flaccidum is a rare species and is found in the tropical islands. Both the species are usually epiphytic in habit and grow upon tree ferns. These species may also be terrestrial and grow in humus or in the crevices of the rocks.
View the detailed Guide of Psilotum nudum: Detailed Study Of Psilotum Nudum (Whisk Fern), Classification, Anatomy, Reproduction