Legality of Cannabis by U.S. Jurisdiction

Jarun Bridge
Coordinates45°46′54″N 15°54′05″E / 45.7817°N 15.9014°E / 45.7817; 15.9014
CrossesSava River
Localesouthwest Zagreb, Croatia
Official nameJarunski most
Characteristics
Total length625 m (2,051 ft)
Width42 m (138 ft)
Longest span150 m (492 ft)
History
Construction cost€40 million (est.)
Location
Map

Jarun Bridge (Croatian: Jarunski most) is a planned bridge that will cross the Sava River in Zagreb, the capital of Croatia. The bridge will be located in the western part of the city, Trešnjevka near Lake Jarun.

The city of Zagreb organized a tender for the design of the Jarun Bridge in 2006,[1] and accepted the project in 2007.[2] Building permits were issued in 2011, but the construction, originally estimated to cost around €40 million, did not start due to a lack of funds. As of 2013, the city was considering a pedestrian-and-cycle design as a cheaper alternative.[2] In early 2020, the process of acquiring the building permits was reinitiated.[3]

References[edit]

45°46′54″N 15°54′5″E / 45.78167°N 15.90139°E / 45.78167; 15.90139